Bolt Nut Washer supplier for Kingfisher Oil Field.

Leading Fastener / Stud Bolt / Anchor Bolt / Bolt Nut washer supplier for Kingfisher Oil Field Uganda.

As a leading Bolt Nut Washer supplier on Kingfisher Oil Field in Uganda.  We supply all types of structural, commercial, PEB’s, Oil & Gas related bolt nut washer, and industrial specialized / drawing bases. Fasteners, Studs, high tensile structural bolts, chemical anchors, and bolts. Range of Gr8.8 / S275JR / A36 / Gr50 / ASTM 572 / ASTM A193 B7 / A194 2H / ASTM A563M / Class 8 / Din 125A / ASTM F436M / B7M / B8 / B8M / 304 / 316 studs. Socket head cap screws, U-bolts, J-Bolt. Vertical Anchor Bolt and associated products from M6 to M125 diameters, in standard.  International specification and special drawing base formats.

In Fact, MF Fastener Industries LLC is the industry leader in the distribution of reliable fastener products. And services served from our current stocking facilities and distribution. Centers all over MENA region (Africa), in addition, we also offer an export service into Africa reaching our all-valuable clients and stakeholders.

In Brief, With a combined experience of more than 50 years, our team of 200 + associates is proud to work in and support our valued Clients.

General Details:

The Kingfisher oil field is located in the Kikuube District of Uganda and will be the first commercial oil field in the country.

The field is estimated to hold 560 million barrels of oil (mbbl) and is anticipated to produce 190mbbl of oil for 20–25 years.

Discovery and exploration of the Kingfisher field

The Kingfisher field was discovered in August 2006 by the Kingfisher-1 well.

Three more wells, namely Kingfisher-1A, Kingfisher-2 and Kingfisher-3, were drilled. The Kingfisher-1A and Kingfisher-2 wells demonstrated the potential of the field, while Kingfisher-3 demonstrated the potential of the southern flank of the field, significantly increasing the extent of the field.

In February 2009, the Kingfisher-3A sidetrack well was drilled to a depth of 2,712m and encountered a 90m gross oil-bearing interval and a 22m net oil pay. The well-intersected Upper Miocene reservoir intervals of the Kingfisher-1A and Kingfisher-2 wells.

The production from the field is expected to be 40,000bbl per day, which will start to decline after five years.

Kingfisher project: processing details

The CPF will process the fluids produced by separating produced water, sand, salts and associated gas to produce crude oil. It will also process part of the associated gas into liquefied petroleum gas (LPG) for sale in the local market.

The facility will be equipped with oil separators, water treatment units, a water injection unit, a gas processing unit, an LPG unit and oil storage facilities. It will also feature power generation facilities to generate electricity using excess gas that will be used to power the upstream facility.

The African construction industry is the target destination for most large economies. This is because of accruing benefits and/or advantages such as the availability of huge natural resources, huge investment opportunities in energy and infrastructure. Cheap labor, and a fast-growing consumer market. Also, there is a beneficial business environment that includes favorable economic development policies and rising commodity prices in addition to continued progress in the fight against corruption and the adoption of democratic governments.

As a sector, the Transport sector has 186 projects 22.7% of the total project value. Followed by power and energy projects with a share of 24.4 of the total project value.